At the end of the five-year construction period of the Central Waste Water Purification Plant, the facility was put into operation.
Last modified: 15 October 2019
28 September 2019| | Belka AŞ
At the end of the five-year construction period of the Central Waste Water Purification Plant, the facility was put into operation.
Last modified: 15 October 2019
Esertepe Mah. Esertepe Rekreasyon Alanı • Küme Evleri No : 1 Keçiören Ankara TURKEY
Phone : +90 (312) 278 50 65 • +90 (312) 299 42 05
Fax : +90 (312) 299 42 03